Darlington station is more than halfway through a $12.8-billion overhaul to refurbish all four of its reactors by the end of 2026 (MATTHEW MCCLEARN / The Globe and Mail)

  • sbv
    link
    fedilink
    arrow-up
    2
    arrow-down
    1
    ·
    1 year ago

    as a low carbon reliable base load its not a bad option

    This is where I’m at. There are other options (e.g. power storage and larger grids), but there doesn’t seem to be much interest in exploring them.