I dont know why they have to lie about it. At $5/8ft board you’d think I paid for the full 1.5. Edit: I mixed up nominal with actual.

  • Captain Aggravated
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    2
    ·
    8 months ago

    From Wikipedia:

    Sawyer is an occupational term referring to someone who saws wood, particularly using a pitsaw either in a saw pit or with the log on trestles above ground or operates a sawmill.

    Operator of a sawmill = sawyer.

    A 2x10 can move a half inch while drying? Sure. It shouldn’t be “while drying” while the construction crew is installing it.