    This isn’t a binary choice. We can do both, whilst we wait for governments to sort out nuclear or fusion. I’d prefer we do what we can to reduce our emissions via renewables now, rather than doing nothing whilst waiting for some potential solution in the future.

    Also, ewaste from renewables can be recycled

    https://link.springer.com/article/10.1007/s10668-023-02925-7

    • @[email protected]
      link
      fedilink
      English
      -7
      edit-2
      22 days ago

      Why create exceptional amounts of trash when you don’t need to? It’s not a binary choice but it should be. It makes absolutely zero sense to waste so many resources when it can be focused into a solution that doesn’t do that.

      Yeah we can keep burning gas in cars or we could transition to EVs. Transitioning to solar and wind respectively is creating more electronic waste. That’s the reason not to use it in the meantime. It’s a different kind of pollutant but still a potent one. We’re literally shipping garbage to third world countries.

      Focus on the best solution, now, not a better solution and then figure it out later. Nuclear. Now.

      • @YungOnions
        link
        1122 days ago

        OK, so whilst we wait the 7 years for the reactor to be built we should, what? hope that coal and gas stops polluting in the interim? Or should we continue to use the tech that, whilst not perfect, is better than the currently most widely used alternatives?

        Nuclear is expensive, slow to deploy and has a inherent risk that renewables do not:

        https://www.nature.com/articles/s41560-020-00696-3

        https://eu.boell.org/en/2021/04/26/7-reasons-why-nuclear-energy-not-answer-solve-climate-change

        Plus the ewaste renewables produce can be recycled easily, cheaply and with far less risk than the waste for nuclear. Is the process perfect? No, so lets concentrate on improving the circular economy around recycling panels, turbines etc. Spend the money and effort on improving the tech that is already proven to be cheaper, more effective and ready now.

        • @[email protected]
          link
          fedilink
          622 days ago

          And seven years seems quite optimistic considering how effectively local governments and committees of concerned NIMBYS have been blocking any new nuclear construction for like, my entire lifetime, at least in the US. Apparently nobody wants a nuclear power plant going up near them and they find a lot of creative ways to jam up the works. I’m not sure we have the time to try to ram dozens of nuclear power plants through those folks while the world is burning.

          • @YungOnions
            link
            3
            edit-2
            21 days ago

            Definitely. That 7 years was just the construction phase. All in the average nuclear plant takes about 14 years to build from planning to switch on.

            • @[email protected]
              link
              fedilink
              English
              -621 days ago

              Lmao no the fuck it doesn’t. From start to finish the time to build has been set by Japan at 3 years. Stop fucking commenting on shit you don’t even try to learn about.

              • @YungOnions
                link
                4
                edit-2
                21 days ago

                Great, but unless you can get Japan to build every Nuclear reactor in the world, that’s a meaningless statistic, isn’t it? The average construction time for a PWR remains 7 years globally:

                https://inis.iaea.org/collection/NCLCollectionStore/_Public/42/105/42105221.pdf?r=1&r=1

                This doesn’t account for planning etc etc so the actual time from pre project to switch on is closer to 11 years, which is admittedly 3 years less than my original figure:

                https://www.iaea.org/publications/8759/project-management-in-nuclear-power-plant-construction-guidelines-and-experience

                Also the fastest Nuclear power plant construction in the world is currently held by Kashiwazaki-Kariwa Unit 6 NPP at 5.41 years, construction start to commercial operation:

                https://inis.iaea.org/collection/NCLCollectionStore/_Public/30/020/30020307.pdf

                That often quoted 3 years doesn’t include inspections, testing etc.

                • @[email protected]
                  link
                  fedilink
                  English
                  -421 days ago

                  “a meaningless statistic” goalposts? Gone.

                  The time to create nuclear plants is far lower than what you quoted, should have been started a decade ago, and we’re still sitting here fucking debating whether we should start.

                  In the most respectful way I can manage, stop bitching about time to build and start now. Encourage the people in charge to do it, now. Stop kicking the can down the road so we can go “damn I guess renewables weren’t enough, we should have made those plants a long time ago.”

                  I’m hostile because I’m sick of the same attitude every year. “top expensive, too long, too unsafe” when it makes more power per dollar spent than any other method, is only a few years away even with inspections, and causes less deaths per GW/H including renewables and including the deaths/affected peoples from nuclear disasters.

                  There is no more room for debate. Nuclear is and has been the option for decades and anyone saying it isn’t is just helping coal and oil. Full stop.

                  • @YungOnions
                    link
                    3
                    edit-2
                    20 days ago

                    The time to create nuclear plants is far lower than what you quoted

                    The average construction time is 7 years. I quoted the International Atomic Energy Agency. I think they know what they’re talking about.

                    and we’re still sitting here fucking debating whether we should start.

                    That’s fine, I get you’re passionate about nuclear and that’s good, it’s better to be passionate about that than coal or gas. But you’re not going to ‘encourage’ anyone by hurling insults at them, are you?

                    Also, your data is out of date. The LCOE of Nuclear is getting more expensive, not less. Wind is now the cheapest:

                    https://en.m.wikipedia.org/wiki/Levelized_cost_of_electricity

                    And solar now has the fewest deaths per unit of electricity:

                    https://ourworldindata.org/grapher/death-rates-from-energy-production-per-twh

                    Look, I get that nuclear probably has its place. But you need to understand that renewables are rapidly becoming the option for carbon emission reduction, and that the evidence supports this. They’re doing this so quickly that by the time we start the process of constructing a NPP now, they will be even better by the time the plant goes into operation. Your point about how we should have started earlier is a valid one but, for a multitude of reasons, that isn’t the world we live in. So why spend time and money trying to change the global attitude towards nuclear when we can spend the same time and money building an arguably better solution that is almost unanimously agreed to be more effective right now?

      • @[email protected]
        link
        fedilink
        622 days ago

        You need to put this in perspective. Solar and wind waste streams are bigger than nuclear, but much, much smaller than coal and completely insignificant compared to regular old municipal waste.

        If you switch from coal to solar right now you will save much more waste than waiting a decade for a nuclear plant to come online. Even if you start building the nuclear plant now, you will still save waste by building solar and throwing it in the trash once your nuclear is online. Anything to switch away from coal faster.