• @[email protected]
    link
    fedilink
    English
    242 months ago

    Why did the guy in charge of this use a giant bridge instead of the bottom method? Is he stupid?

    • @[email protected]OPM
      link
      fedilink
      English
      60
      edit-2
      2 months ago

      Digging used to be much more expensive, and calculating pressure much dicier. The Romans used the pressure method over short distances, with reliable piping (noting that pipes under high pressure would need to be sealed with earth or concrete), but over large distances, it was easier just to make a giant-ass water bridge and ensure it was sturdy.

        • @[email protected]
          link
          fedilink
          English
          262 months ago

          I dug like an 8 inch hole next to my walkway the other day and it took like 5 hours and I didn’t accomplish what I wanted.

        • @[email protected]
          link
          fedilink
          English
          32 months ago

          When it comes to DIY I’m not touching anything remotely similar to something Colin Furze would make a video about.

          So far that rule of thumb seems to hold up quite well.

        • @Scubus
          link
          English
          22 months ago

          Oh please, I dug a 6 inch wide, 1 foot deep hole yesterday and outside of the cost of the shovel it cost me nothing. People these days just don’t want to work /s