• TheSlad
    link
    fedilink
    English
    arrow-up
    6
    ·
    5 months ago

    Ive noticed that low-brain work is a lot easier to get myself to do. Its like my brain is lazy but my body isnt. Last spring I dug up 125 sqft of grass, lined it with decorative bricks, spread several 100lbs of topsoil, and sowed wildflowers. And before that I busted up 30 feet of sidewalk with a sledghammer and spread 3 cubic yards of fill dirt. All required basically zero brainpower. But godforbid i have to concentrate for 2 hours to diagnose and fix a bug at work! If I could get paid a software dev salary to shovel dirt for 8 hours a day I would in a heartbeat.

    Uber driving sounds nice tbh. Phone tells you where to go and what to do. No brain needed.