Inspired by the very similar thread about school incidents.

  • @[email protected]
    link
    fedilink
    628 days ago

    Buried lines of all kinds are frequently severed by excavators because their position isn’t properly or fully documented.

    The best set up I ever saw was a sewer tunnel, almost 12 feet tall, that handled all the services. From sewage to water to electricity to data; it held everything and was trivial to maintain and run new lines in.

    • @[email protected]
      link
      fedilink
      328 days ago

      line sounds like a really interesting idea, although I feel like documenting where you put things should be a basic task. Probably why it’s not done properly