Welcome everyone! The final flight of Vega has arrived.

Scheduled for (UTC) 2024-09-05 01:50
Scheduled for (local) 2024-09-04 22:50 (GFT)
Launch site ELV, Guiana Space Centre, French Guiana, France
Launch vehicle Vega
Payloads Sentinel 2C
Mission success criteria Successful launch and deployment into Sun-Synchronous Orbit

Livestreams

Stream Link
Arianespace (English) https://www.youtube.com/watch?v=BZzcOxxeMyA
Arianespace (Français) https://www.youtube.com/watch?v=KgrF4wPqS8E
Space Affairs https://www.youtube.com/watch?v=3vELtvL2syE
The Launch Pad https://www.youtube.com/watch?v=y59evtZ0mE0

Stats

☑️ 1st Vega mission of 2024, 24th and final Vega mission overall

☑️ 2nd Arianespace mission of 2024, 298th mission overall

Payload info

NextSpaceflight

Sentinel-2 is an Earth observation mission developed by ESA as part of the Copernicus Programme to perform terrestrial observations in support of services such as forest monitoring, land cover change detection, and natural disaster management.

ESA

The Copernicus Sentinel-2 mission provides high-resolution optical imagery for a wide range of applications including land, water and atmospheric monitoring. The mission is based on a constellation of two identical satellites flying in the same orbit but 180° apart: Sentinel-2A and Sentinel-2B. Together, they cover all of Earth’s land and coastal waters every five days.

The satellites each carry a high-resolution multispectral imager that generates optical images in the visible, near-infrared and shortwave-infrared part of the electromagnetic spectrum. From their altitude of 786 km, they provide continuous imagery in 13 spectral bands with resolutions of 10 m, 20 m and 60 m, with a large swath width of 290 km.

Sentinel-2C is the third in the Sentinel-2 series. Once commissioned in orbit, it will replace its predecessor, Sentinel-2A. Later, Sentinel-2D will replace Sentinel-2B. This all ensures the continuity of imagery for Copernicus Services and beyond.

Please feel free to post updates and questions in the comments!

  • threelonmusketeersOP
    link
    English
    1
    edit-2
    11 days ago

    Stage 4 shutdown confirmed. A circularization burn remains.