• Jax
    link
    fedilink
    English
    arrow-up
    1
    ·
    2 months ago

    I’m sure with some research you could find a company willing to follow your specifications and instructions, but obviously that comes with cost.

    To your second point, thanks for the heads up. There’s plenty more research that I need to do before I worry about drainage, but I’ll keep the thought in mind.

    • chiliedogg@lemmy.world
      link
      fedilink
      English
      arrow-up
      3
      ·
      2 months ago

      Septic and Drainage should come before any kind of detailed architecture. It’ll save you 30 grand in Engineering revisions if you don’t have to re-do the drainage plans.

      Also, never let an architect be in charge of a project. It’s like having the font designer be in charge of office software.