• TWeaK
    link
    fedilink
    English
    18 months ago

    I think I see what you mean, but really then you’re only ever looking at soil made up of two types. Clay loam could be 30 clay / 70 silt, or 60 clay / 40 sand, or 30 silt / 70 sand. That doesn’t make sense, because you could also, for example have a 30 clay / 70 silt in the sandy clay loam or silty clay loam regions - the 3rd thing is supposed to tell you where along the line you stop, yet whenever you do that you have 3 percentages that add up to more than 100%.

    Maybe you wouldn’t call it 50% sand, and instead pick one of the sand diagonals to get a point in the clay loam region, but no matter how I look at it the percentages don’t add up.

    • Ech
      link
      fedilink
      English
      4
      edit-2
      8 months ago

      You’re misinterpreting the lines. Each number only corresponds to the line perpendicular to the 100 point on their axis, and each line only corresponds to one number, not the 2 it looks like it connects to.

      So for example, if you’re looking at the middle-top point of the “clay loam” category, right above the ‘l’, you get 30% sand/40% clay/30% silt.

      *I whipped up a rough layout that better indicates which number goes to which line: https://files.catbox.moe/ljm6ih.png. Would be even better with the numbers aligned more precisely, but it’s not worth the effort for all that.