• @Tremble
      link
      English
      147 months ago

      Wow. You can’t be as dumb as you sound. I hope not at least

        • @Tremble
          link
          English
          177 months ago

          Why don’t we just call you the fucking energizer bunny. You’re talking in circles.

          The company chose not to prepare their infrastructure for cold weather. And they still haven’t done so even after the 2021 disaster.

          You don’t have to be an electrical engineer to see that the reason this happened is corporate greed, literally putting profits over people’s lives.

        • @[email protected]
          link
          fedilink
          English
          11
          edit-2
          7 months ago

          The goal is to prevent destruction and focus on replacements. Just accepting that shit is broken is dumb as fuck and shows literally no initiative or idea how things work.

          Snow breaking the lines? Reinforce them with sturdier gauges. Poles getting downed? Guy wires, better poles, move the wires underground.

          There are literally dozens of solutions that you have no fucken idea could be implemented. How long have you worked in power? Are you a lineman? Cause you must be the worst, dumbest mother fucker to work with power and not kill yourself.

    • @[email protected]
      link
      fedilink
      English
      27 months ago

      Fwiw (I live in Illinois) over the years our system was updated with materials and redundancies to counter loss of service during storms. There’s been a number of times over the last few years that a bad storm hits and does damage that previously would have created a loss of power, but you can watch the power flicker for a few seconds while the system tests alternate routes that are able to continue to provide service to the most residents. There was a time that power outages were expected a few times a year during bad storms, but I can’t recall the last time we had a weather related outage of more than a few minutes.

      Obviously local to the damage there nothing to do but wait for the infrastructure to be repaired, but that happens far faster when there’s redundancies supplying the majority and fewer repairs that need to be addressed.