The proposed wind farm, in the outer Firth of Forth, will have more than 300 giant turbines stretched across an area four times larger than Edinburgh.

If built, the 4.1 gigawatt Berwick Bank “super project” would be the largest offshore wind farm in the UK, capable of powering over six million homes – more than double the number in Scotland.

The Scottish Government has set out a goal to deliver up to 11GW of offshore wind capacity by 2030 as part of the national target to reach net zero climate emissions by 2045.

  • YungOnions
    link
    fedilink
    English
    arrow-up
    5
    ·
    10 months ago

    It’s frustrating that these things are not considered when picking a potential location for the farm. To be clear I’m not saying we should go ahead and build anyway; the ecological impact of these projects are just as important as their output, but if this is cancelled not only is it likely that it will never get relocated elsewhere, but it’ll also be used as yet another reason why ‘renewables = bad’. What a massive waste of funding and potential.

    • snota
      link
      fedilink
      English
      arrow-up
      2
      ·
      10 months ago

      Unfortunately wind farms are always going to have an impact on nature. All major infrastructure projects do. The alternative of continuing to rely on fossil fuels is already having a way more damning impact on all wildlife.