Terrible both in scraping the project and how nothing has been done for a quarter billion

  • Dave@lemmy.nzM
    link
    fedilink
    arrow-up
    2
    ·
    edit-2
    10 months ago

    I’m wondering if they should have planned to build on existing roads. They could have finished the project, then left National with the job of purchasing property to widen roads. It seems buying a 20km stretch of land to build it on would have been more expensive than building the thing, especially considering the skyrocketing Auckland house prices since the project started.

    • Ilovethebomb@lemmy.nz
      link
      fedilink
      arrow-up
      2
      ·
      10 months ago

      Build on the surface, with an aim to eventually underground part of the network in the future. That way, any future government would be very unwilling to remove a working service.

      Was the plan to demolish a bunch of houses to build the line or something?

      • Dave@lemmy.nzM
        link
        fedilink
        arrow-up
        1
        ·
        edit-2
        10 months ago

        I’m not sure, I’m not that familiar with it so just basing it on what I’d read in the linked article. But it shows maybe 2/3rd above ground, and states it would be separate to roads for cars. I’m not sure how you could do that without buying a bunch of land (admittedly on a second reading not 20km, but over 10KM for the above ground part).

        • Ilovethebomb@lemmy.nz
          link
          fedilink
          arrow-up
          2
          ·
          10 months ago

          Isn’t the whole advantage of light rail that you can run it along surface streets?

          This is reminiscent of the the harbour cycle bridge, just a ridiculous, over the top proposal that was in no way cost effective.

          I think really annoys me the number of opportunities the Ardern government missed, both in Auckland and Wellington.

          • themusicman@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            10 months ago

            The harbour cycle bridge is justifiable if they also spent the same amount again on a network for the rest of Auckland.

          • Dave@lemmy.nzM
            link
            fedilink
            arrow-up
            1
            ·
            10 months ago

            I would love NZ to invest in long term infrastructure projects. These proposals seem crazy now in hindsight, but I feel it’s only because to truely do something like this you probably need support across the aisle.

            In hindsight, it seems obvious that they should have done what someone else suggested, lay rail over existing roads then move sections underground over time.