Load-following NPPs in France claim power output ramps as much as 5%/min if necessary, though typical ramps are kept below 1.5%/min.
Certain French NPPs routinely decrease power output 50% at night.
It’s true that load-following is mostly not done with nuclear in the US, but this is policy/common practice/habit, not a technical limitation of nuclear power plants.
It’s a shame that you’re being voted down here, even though your points are actually more on the factual side. Well, that’s probably the fate of those who “dare” to say something against nuclear. Even if everyone else demonstrably doesn’t have a clue about the subject: They’re still bashing it. It’s just good that downvotes on Lemmy don’t really matter.
This is not correct.
A Brief Survey of Load-Following Capabilities in Modern Nuclear Power Plants
It’s true that load-following is mostly not done with nuclear in the US, but this is policy/common practice/habit, not a technical limitation of nuclear power plants.
thanks for sharing this!
hilarious to see the other guy doubling down even after you cited an actual source.
It is, you just proved it yourself:
“typical ramps are kept below 1.5%/min.”
Compare that with batteries or pumped hydro.
That’s plenty fast enough for a power grid.
I think you’re getting peaker plants, e.g gas fired confused with load following.
Nuclear plants are not used as peaker plants. you incorrectly stated that they are.
It’s a shame that you’re being voted down here, even though your points are actually more on the factual side. Well, that’s probably the fate of those who “dare” to say something against nuclear. Even if everyone else demonstrably doesn’t have a clue about the subject: They’re still bashing it. It’s just good that downvotes on Lemmy don’t really matter.