This is my latest work - a Mitsubishi Space Star (also marketed as Mitsubishi Mirage) modelled in Version 3.6.9.

It took me approximately 180 hours which spread over the course of 6 weeks (Blender, modelling only) as well as an additional 8 hours for tracing the side, front, back and top view (using Affinity Designer) which I used as reference images to create the general shape.

All details were built with eye measure from photos.

Most of the car is symmetrical, which means that only one half had to be built. I used the mirror modifier for almost everything as well as the subdivision modifier, shrinkwrap modifier (for the decals and the back lights) and array modifier (for the grille and for the heating lines in the back window, also for the wheel caps to an extent).

As mentioned above it took some hours to complete the work. One reason might be that the work process is much slower than anticipated, due to lack of knowing all the tricks and features.

My question to you is: Do you also spend so much time creating your work with Blender?

The result (for the upload I removed the number plates):

  • Kuruad@jlai.lu
    link
    fedilink
    arrow-up
    2
    ·
    9 months ago

    I don’t think i have spent more than 20 hours on a project. Most of the time it’s less than 10. Of course the results are less impressive.