I had a different direction in mind actually. My experience is that if I work fast (or rather faster than the slow colleagues) while delivering good work, I just get more work from my boss because I have time. If I slow down so everyone is at the same pace, I have less work in the end. This is why I think a fixed 40 hour work week is shit. Let me go if I’m done with my tasks.
More like nonsmooth work leads to more work.
Smooth is fast
I had a different direction in mind actually. My experience is that if I work fast (or rather faster than the slow colleagues) while delivering good work, I just get more work from my boss because I have time. If I slow down so everyone is at the same pace, I have less work in the end. This is why I think a fixed 40 hour work week is shit. Let me go if I’m done with my tasks.