The U.S. government doesn’t want another 2021 freeze situation.

    • Amoxtli@thelemmy.clubOP
      link
      fedilink
      English
      arrow-up
      2
      arrow-down
      1
      ·
      edit-2
      1 hour ago

      It is a transmission line that is part of the overall national strategy to increase reliability and connectivity. The ERCOT market is different from the rest of the country, which is a federal jurisdiction. Different rules that make electrical trade illegal/incompatible. For the ERCOT market, it means it can, under emergency request, draw energy from MISO-S region, instead of burning coal & oil emergency stockpiles. While the same line provides additional reliability and throughput for the MISO-S region.