I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

  • Boomkop3@reddthat.com
    link
    fedilink
    arrow-up
    4
    ·
    2 months ago

    Even if not between the tracks, aside the tracks there is quite a bit of empty space. That space gets a lot less of a hard time from the trains rolling by