    If it’s just hours, that’s fine. I’ve spent months on a system before that ultimately got scrapped. When I was at Google, they accidentally had two teams working on basically the same project. The other team, with about 40 engineers, having worked on it for about a year, had their project scrapped. My team was meant to do the same work, with about 23 engineers. So if you’re ever wondering why Hangouts Chat launched kinda half baked, that’s why.

    • Jax
      link
      fedilink
      arrow-up
      5
      ·
      9 hours ago

      Some people like to see the things they spend time on finished.

  • Wild_Mastic@lemmy.world
    link
    fedilink
    arrow-up
    12
    ·
    12 hours ago

    I spent 1 year coding the same feature, but each 3 months I had to restart from scratch because management decided a new ‘flow’ and the previous one was completely different.