• Ross_audio@lemmy.world
    link
    fedilink
    English
    arrow-up
    11
    arrow-down
    1
    ·
    17 hours ago

    Trains are easy and they’re easily electrified already. So putting solar on the trains won’t have any advantage.

    Rails are the difficult part of railways. They never seem to put them between my house and my work. They’ve put something called a road in between instead.

    • Evil_Shrubbery@lemm.ee
      link
      fedilink
      English
      arrow-up
      6
      ·
      16 hours ago

      I presume they meant to put in railway infrastructure.

      Railways cost so much less than one highway, we could have a system basically from home to work.
      (eg smol trams to a midway se station to high-speed trains)

        • Evil_Shrubbery@lemm.ee
          link
          fedilink
          English
          arrow-up
          2
          ·
          edit-2
          5 hours ago

          You mean the huge underground train station & several miles of tunnels around if, with all the work preformed underneath an undisturbed city?

          Yes, that is still waaay cheaper than constructing an underground highway of that magnitude/that area (+ an underground station you conveniently included in the estimate) .

          Or did you have something else in mind?

          • CookieOfFortune@lemmy.world
            link
            fedilink
            English
            arrow-up
            2
            arrow-down
            1
            ·
            5 hours ago

            Ok? The point is that rail development is expensive and like an order of magnitude the cost of Aptera. Ideally we could do both but they shouldn’t be put into the same bucket.

            • Evil_Shrubbery@lemm.ee
              link
              fedilink
              English
              arrow-up
              1
              ·
              5 hours ago

              No it’s not, railway infrastructure comes at a fraction of a cost of highways, the maintenance alone, all the tires, fuel, insurance, etc of cars, even the environment impact (in like the area they cover/destroy) is minute.

              All that costs, somebody has to pay.

        • Landsharkgun@midwest.social
          link
          fedilink
          English
          arrow-up
          3
          ·
          edit-2
          9 hours ago

          I note with interest that you are repeatedly posting the same cherry-picked factoid.

          Average cost per mile for new track in the USA can be anywhere from $100mil/mile to over $1billion/mile for complicated projects like tunneling. This is roughly 50% higher than Europe - most likely for the simple fact that they have a larger industry for it. These are both quite high on an international scale- China builds new track for 24-48mil USD per mile.