Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • TheBlackLounge@lemm.ee
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    1
    ·
    16 hours ago

    No. I mean, hopefully both, but solar panels can’t be fully recycled into new solar panels. A bunch of rare materials need to be mined over and over.