• finitebanjo@lemmy.world
    link
    fedilink
    arrow-up
    2
    ·
    13 hours ago

    Overloading equipment will inevitably lead to early failure, even if not right away. It’s the same logic as skipping load bearings in a building because the beams are rated to a lower value than their average strength.