I’m dying chat.

Credit: An anonymous labrat friend. Thank you.

  • reddfugee@lemmy.world
    link
    fedilink
    English
    arrow-up
    9
    ·
    2 days ago

    Wait, industry is moving away from central neutralization? My wife is the facilities manager for an R1 engineering department and they commissioned a building two years ago with a central acid collection tank -_-

    • Thrashy@lemmy.world
      link
      fedilink
      English
      arrow-up
      12
      ·
      edit-2
      2 days ago

      It varies from place to place, but the trend is away from them. I recently did a basis-of-design study for another R1 institution, and they said in no uncertain terms that they wanted to decommission the existing central system in their circa-1990 lab tower. Facilities departments often find them to be a PITA to manage and maintain, versus just requiring researchers to neutralize their acid waste before putting it down the sink, or collecting other hazardous waste to be taken away by a service