• rddman@alien.topB
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 year ago

    Rapidus was created last year and only started clearing the plot of land to build their first fab in September. Talking about 1nm production is putting the cart before the horse, they aren’t expecting their first 2nm node to be in production until 2027.

    They talk about production only insofar that production will be possible when they have developed the required technology.
    Developing technology that enables production of the next smaller node takes increasingly more time, so starting to develop that technology now is appropriate if you want a chance of having it 10 to 15 years down the road.