• @[email protected]
    link
    fedilink
    102 months ago

    All I can think is it has to be a massive pain in the ass to do maintenance. You’d have to shut down the whole park and remove a bunch of unrelated slides to fix anything on one ride.

    • @brbposting
      cake
      link
      English
      22 months ago

      When The Boiler breaks

      So you have to shut down The Fractionator, Extruder, Cracker, and Vaporizer