[yeah it’s twitter junk, I know]

  • @[email protected]
    link
    fedilink
    310 months ago

    What a fantastic idea. let’s all switch to electricity where our utility companies can then just artificially jack up our rates cause they know we will have to pay them to get to work.

    • @emergencyfood
      link
      210 months ago

      There’s this thing called nationalisation. And until that happens, there are these things called rooftop solar panels.

      • @[email protected]
        link
        fedilink
        -710 months ago

        If you think letting the government control our utilities is a good thing, idk what to tell you.

        As far as solar panels, yeah…I’m very much aware. I’ve been a solar design engineer for 8 years now, I design those systems. And you think it’s reasonable to pay tens of thousands on a new electric car only to then have to pay tens of thousands more to own a PV system that will ensure you can actually use that car?

        I’ll stick with my gas powered motorcycle. Thanks.

        • @baked_tea
          link
          710 months ago

          This reads like a trump speech

        • @Yendor
          link
          210 months ago

          Is rooftop Solar that expensive in the US? In Australia, I can get a 5kW system fully installed for US$3500.

          • @huskypenguin
            link
            310 months ago

            Yes. It’s very expensive. $20-$60k USD

            • @Yendor
              link
              010 months ago

              Are you kidding?? Good solar panels are 60-70c/watt, a high end European inverter is $2k, install takes half a day for 2 tradies.

              Even with zero incentives or rebatesds, how can a 5kW system cost more than $7k?

              $3500 for panels $2000 inverter $800 labour

              • @huskypenguin
                link
                110 months ago

                Sadly I’m not. There’s a lot of regulatory hurdles required before even turning it on. So you pay for labor and a dedicated team navigating permits and regulations.

                • @Yendor
                  link
                  110 months ago

                  Sounds like your government doesn’t want you getting energy independence. Australia was like that 10+ years ago, but now it’s super easy. There are only 2 forms (one for the inverter, one for the panels) and the installer fills it all out for you. Systems <5kW per phase don’t even need prior approval, the installer just submits paperwork after the job is done. The only time it costs you, is if you need your old meter upgraded to a smart meter.

                  • @huskypenguin
                    link
                    110 months ago

                    Yea, with privatized electric companies they definitively don’t want us to have energy independence.