That’s 15MW for 4 hours. Typical period of tight conditions is probably more like 1 hour, so 4 hour capacity is overkill for what Texas has been going though this summer). You could get more capacity for a 2 hour period. I think Texas peak power demand was about 100GW (I think that excludes some parts of Texas that aren’t part of the Texas grid at the East and West ends)
Site I worked at was on the company’s smaller end and we consumed around 10MW an hour.
That’s 15MW for 4 hours. Typical period of tight conditions is probably more like 1 hour, so 4 hour capacity is overkill for what Texas has been going though this summer). You could get more capacity for a 2 hour period. I think Texas peak power demand was about 100GW (I think that excludes some parts of Texas that aren’t part of the Texas grid at the East and West ends)