To ease load on aging grid, state program offers energy credits to bitcoin miners to curtail their power consumption.

  • Bobert
    link
    fedilink
    arrow-up
    2
    ·
    1 year ago

    Site I worked at was on the company’s smaller end and we consumed around 10MW an hour.

    • WalrusDragonOnABike@kbin.social
      link
      fedilink
      arrow-up
      2
      ·
      1 year ago

      That’s 15MW for 4 hours. Typical period of tight conditions is probably more like 1 hour, so 4 hour capacity is overkill for what Texas has been going though this summer). You could get more capacity for a 2 hour period. I think Texas peak power demand was about 100GW (I think that excludes some parts of Texas that aren’t part of the Texas grid at the East and West ends)