• azertyfun
    link
    fedilink
    English
    arrow-up
    1
    ·
    edit-2
    6 months ago

    What kind of non-agile bottom-up software projects have you experienced? Bottom-up waterfall? I guess it’s possible in theory but that would be a sight to behold.

    My only point is that in most situations, upper management are fools that should be left to their devices and should never get a say in development methodologies. By definition if upper management imposes Scrum, it’s a self-defeating prophecy.

    Waterfall Agile Scrum
    Top-down Can be great (esp. with rigid requirements like fintech, for safety-critical systems, or integration with traditional engineering processes with rigid schedules and feature sets) but will probably be more expensive Bad managers trying to make-up for their own lack of foresight Can’t exist (but some companies pretend very hard)
    Bottom-up Probably can’t exist (but I haven’t seen anyone try) Yes Yes

    Your average tech company should be somewhere in the bottom-right, but bad managers are trying to pull the needle upwards to justify their existence or make up for their incompetence. But they still call that “Agile” (which can be true by some definitions of the word) or “Scrum” (which that isn’t, by definition).