• You999
        link
        fedilink
        English
        arrow-up
        10
        ·
        1 year ago

        It is intentional but you have the wrong reason. Right now all of the class one railroads are trying a business strategy called precision schedule railroading in order to boost their stock prices. The meat and potatoes behind PSR is to lower the railroad’s operation ratio as lower as possible by reducing anything that isn’t absolutely critical to making the business run. That means cutting your staff to below a skeleton crew level while fighting the FRA to allow for one man crew trains, running extremely long trains even if it literally divides a community, and deferring maintenance unless uncle Sam wants to pitch in. In some extreme cases of PSR some railroads have even gone as far as closing down tracks in sections with multiple main lines.

        • Jax
          link
          fedilink
          English
          arrow-up
          7
          ·
          1 year ago

          How is this shit not illegal?

      • greenskye@lemm.ee
        link
        fedilink
        English
        arrow-up
        3
        ·
        1 year ago

        I feel like the car industry doesn’t compete at all with cargo rail. You don’t move tons of coal with a semi. That would be astronomically more expensive.

  • gravitas_deficiency
    link
    fedilink
    English
    arrow-up
    22
    arrow-down
    1
    ·
    1 year ago

    All the rail companies are doing at this point is making the case for their shit to get nationalized stronger every single day. This is critical infrastructure, and they’re intentionally running it into the fucking ground.