• tim-clark
    link
    fedilink
    26 months ago

    Adding a lift point. Did 12 of them and the driver was on the toasty side when done

    • Fuck spez
      link
      English
      16 months ago

      A lift point on what, though?

      • tim-clark
        link
        fedilink
        16 months ago

        Large pieces of billet material, lift point added for moving between machines on the first 2 operations. Afterwards the item is light enough to pickup. Roughly 323lbs of material removed in the first 2 operations. Then the items went on to 6 months of machining to complete them. Very expensive one off pieces manufactured during R&D. Final products are low number runs of 2-3 items that take 5 months to manufacture. This was a single piece in a larger piece of equipment that I manufactured. Largest tolerance on the item was 0.0005" with true position at 0.0001". Challenging item to handle and machine

        • Fuck spez
          link
          English
          16 months ago

          What were they parts of?

          • tim-clark
            link
            fedilink
            16 months ago

            Wafer manufacturing. High heat application for the unit, part described is the main internal platter